Friday, March 10, 2006

New Bridge on the River Savegre.



The company moved the logs from the old bridge to make way for steel I beams and structural decking. Re-bar enough in case a bomb gets dropped on it and lots of concrete. A constant supply of sand and gravel comes from down the road, 1 1/2 hours away. The projected finish date is for March 31st.

No comments: